

Reviewed by Mark Ellison
Mark Ellison is a licensed site manager and tool hire specialist with 15 years' experience across residential and commercial builds, advising trade customers on choosing the right tools for the job.
In our expirience fitting a new kitchen is a rewarding project, but getting a professional-looking finish requires more than simply assembling cabinets and putting appliances in place. Accurate measurements, careful preparation, and completing each stage in the right order can save time, prevent costly mistakes, and make installation much easier.
In this guide, we'll take you through the key stages of fitting kitchen units and appliances, from planning and installing cabinets and worktops to plumbing considerations and those all-important finishing touches.
Remember, some parts of a kitchen installation are best left to the professionals. Gas work and certain electrical work should always be carried out by appropriately qualified tradespeople.
Before You Start: Planning Your Kitchen Installation
Good preparation can make the entire kitchen installation run more smoothly. Before fitting anything, check your kitchen plans and measurements carefully. This includes the position of doors, windows, sockets, water supplies, waste pipes, and other services.
It's also worth checking the dimensions and installation requirements of every appliance. Integrated ovens, dishwashers, and fridge freezers may require specific cabinet sizes, clearances, or ventilation, so always follow the manufacturer's instructions.
Before getting started:
- Check all measurements against your kitchen plan.
- Make sure walls and floors are ready for installation.
- Identify water, waste, electrical, and gas connections.
- Check appliance dimensions and ventilation requirements.
- Unpack and inspect units for damage.
- Make sure you have the necessary tools, fixings, and materials.
What Causes Limescale?
Limescale forms when hard water containing high levels of calcium and magnesium is heated. As the water temperature increases, these minerals are left behind, gradually building up inside pipes, boilers, cylinders, taps and appliances.
Areas with hard water are particularly susceptible, making limescale prevention an important consideration for many homes and commercial buildings across the UK.
What Order Should You Fit a Kitchen?
The exact process will depend on your kitchen design, but a typical installation will follow this order:
- Prepare the room and services.
- Mark out the position of your units.
- Fit and level the base units.
- Install the wall units.
- Measure, cut, and fit the worktops.
- Position and connect appliances.
- Fit doors, handles, plinths, and finishing panels.
- Complete sealing and final adjustments.
Taking the time to plan each stage before installation begins can help prevent problems later and ensure everything fits together as intended.

Case study: How to Fit Kitchen Base Units
Base units provide the foundation for your kitchen, so getting them level and correctly positioned is essential. Before fitting, mark the layout on the walls and identify the highest point of the floor, as this will help you establish a consistent level across the entire run.
Start With Corner Units
If your kitchen includes a corner unit, this will usually provide a good starting point. Position it according to your kitchen plan and check that it's level before moving on to adjoining cabinets.
Level and Join the Units
Adjust the cabinet legs as required, checking each unit with a spirit level as you work. Once you're happy with the positioning, clamp neighbouring cabinets together before securing them. This helps keep the fronts aligned and creates a neat, consistent run.
Secure the Units
Finally, secure the cabinets according to the manufacturer's instructions. Always use fixings appropriate for the wall construction and check for hidden pipes or cables before drilling.
Take your time at this stage. Properly aligned base units will make fitting your worktops, doors, and appliances much easier later.
How to Fit Kitchen Wall Units
Wall units need to be carefully measured, levelled, and securely fixed, particularly once they're loaded with crockery, cookware, or other kitchen essentials.
Start by marking the correct height and position of your cabinets using a spirit or laser level. Don't assume that the ceiling, worktop, or floor is perfectly level – always work from your own reference line.
Choose the Right Fixings
The correct fixings will depend on whether you're working with masonry, timber studs, or another type of wall construction. Make sure your chosen fixings are suitable for both the wall and the expected load of the cabinets.
Check and Align Your Units
Fit each cabinet according to the manufacturer's instructions, checking that it's level and securely supported. As you add neighbouring units, align the cabinet fronts before joining them together.
Once all the units are secure, you can make final adjustments to the doors and hinges to achieve consistent gaps and a neat finish.
Fitting Kitchen Worktops
Once your base units are level and secure, you can move on to fitting the worktops. Accurate measurements are particularly important here, as walls aren't always perfectly straight or square.
Measure carefully before making any cuts and check the manufacturer's instructions for your chosen worktop material. When cutting openings for sinks and hobs, mark the position precisely and make sure there's enough clearance for the appliance or fitting below.
Remember to:
- Check every measurement before cutting.
- Seal exposed cut edges, particularly around sinks.
- Use the correct method for joining worktop sections.
- Secure the worktop firmly to the base units.
- Apply suitable sealant around areas vulnerable to moisture.
A simple rule is worth remembering: measure twice, cut once. Taking a few extra minutes to double-check your measurements can prevent an expensive mistake.
How to Fit Integrated Kitchen Appliances
Integrated appliances are designed to sit neatly within your kitchen units, but accurate positioning is essential. Always check the manufacturer's installation instructions first, as dimensions, ventilation requirements, and clearances can vary between appliances.
Integrated Dishwasher
Make sure there is suitable access to the water supply, waste connection, and power. Once positioned, level the dishwasher carefully before fitting and aligning the cabinet door.
Integrated Fridge or Freezer
Allow for the ventilation specified by the manufacturer and make sure the appliance is level. Pay particular attention when fitting the cabinet door so that it opens smoothly without catching neighbouring units.
Integrated Oven and Hob
Check the required cabinet dimensions and ventilation before installation. Hob cut-outs should be measured particularly carefully before cutting the worktop.
Electrical connections and gas appliances should always be installed by appropriately qualified professionals where required.
Extractor Hood
Position the extractor according to the manufacturer's recommended clearance above the hob. You'll also need to determine whether it will recirculate filtered air or connect to external ducting, as this will affect the installation.

Complete Your Kitchen Project with MP Moran
Fitting integrated appliances is often one of the final major stages of a kitchen installation. Once everything is correctly positioned, level, and connected, you can turn your attention to doors, handles, plinths, trims, and those finishing touches that bring the whole kitchen together.
Whether you're planning a completely new kitchen or updating an existing space, MP Moran can help you find the products and expert support you need. Explore our range of kitchens and bathrooms, or visit one of our kitchen and bathroom showrooms to see products in person and discuss your project with our experienced team.
You can also visit your local MP Moran branch for advice, materials, tools, and everything else you need to get the job done.
If you're a trade professional, sign up for an MP Moran Trade Account to make purchasing for your projects even easier.
Fitting Kitchen Appliances and Units FAQs
What order should you fit kitchen units and appliances in?
+
Most kitchen installations follow a set sequence: first fix plumbing and electrics, then base units, wall units, worktops, sink and hob cut-outs, appliances, and finally plinths, end panels and sealing. Getting first fix services in place before any cabinets go in means pipes and cables can be routed to the right positions without cutting into finished units. Base units are usually fitted before wall units so the worktop height can be set and the wall units aligned from it. Appliances are normally fitted once the worktops are secured, as integrated ovens, hobs and dishwashers rely on accurate unit and worktop positions. Leaving plinths and sealant until last protects them from damage while the rest of the work is completed. Browse our kitchen units range to plan your layout around standard cabinet sizes.
How do I make sure kitchen base units are level?
+
Start by finding the highest point of the floor along the run, as every unit will be levelled up to that point rather than down. Mark a level datum line on the wall at worktop height using a long spirit level or laser level, then adjust each unit's legs to meet it. Check every unit for level both front to back and side to side, and make sure the carcass sits square before fixing it to the wall. Clamp neighbouring units together and fix them through the side panels so the whole run behaves as one solid frame. Taking time at this stage avoids gaps under the worktop, doors that will not align, and appliances that sit unevenly. A good quality spirit level is one of the most important tools on any kitchen fit.
How do you securely fix kitchen wall units?
+
Wall units carry heavy loads once they are filled with crockery and glassware, so the fixings must suit the wall construction. Most units hang from adjustable brackets or a hanging rail screwed to the wall, which allows you to fine tune the height and level once the cabinet is in place. Solid masonry walls normally take heavy duty screws with suitable wall plugs, while plasterboard walls need cavity fixings rated for the load or, ideally, timber noggins fitted behind the board before it is closed in. Set the underside of the wall units at a consistent height above the worktop, and check any cooker hood clearance specified by the hood manufacturer. Always scan for hidden pipes and cables with a detector before drilling. Our specialist fixings range includes options for plasterboard and cavity walls.
How do I fit a kitchen worktop?
+
Worktops go on once the base units are level, fixed together and secured to the wall. Measure each run carefully, allowing for walls that are rarely perfectly straight, and scribe the back edge where needed so the worktop sits tight. Corner joints are usually formed with a worktop jig and router, then pulled together with worktop connector bolts and sealed. Sink and hob cut-outs are marked from the manufacturer's template, and every cut edge on a laminate or timber worktop should be sealed to stop moisture getting in and causing the core to swell. The worktop is then fixed from below through the unit brackets, using screws short enough that they cannot break through the surface. Explore our worktops and accessories to find a worktop and the finishing products to complete it.
Can I fit integrated kitchen appliances myself?
+
Many integrated appliances, such as built-in fridges, freezers and dishwashers that plug into a socket, can be fitted by a competent DIYer following the manufacturer's installation guide. These appliances usually need a specific housing size, a door fixing kit and a ventilation gap, so check the dimensions before you order your units. Built-in ovens and hobs need more care because of their electrical load, and any gas appliance must legally be connected by a Gas Safe registered engineer. Electric ovens and induction hobs may also require a dedicated circuit, which should be designed and installed by a qualified electrician. Always confirm cut-out sizes and clearances in the appliance instructions before cutting any worktops or units. Browse our kitchen appliances range to compare models before finalising your plan.
How do I install a kitchen sink and tap?
+
It is much easier to fit the tap, waste and overflow to the sink before it goes into the worktop, as working underneath a fitted sink is awkward. Inset sinks drop into a cut-out made from the manufacturer's template, with a seal or sealant around the rim and clips fixed underneath to pull the sink down tight. Undermount sinks need a solid surface worktop and are usually installed alongside the worktop itself. The tap tails connect to the hot and cold supplies, ideally through isolation valves so the tap can be maintained later without draining the system. The waste then connects to a trap and the waste pipe, and every joint should be checked for leaks with the water running. Browse our kitchen sinks, taps and wastes to choose a combination that suits your worktop.
How are dishwashers and washing machines plumbed in?
+
Most dishwashers and washing machines take a cold water supply through a dedicated appliance valve and drain into the kitchen waste. The supply is usually teed off the cold feed under the sink and fitted with a quarter-turn valve, so you can shut off water to the machine without affecting the rest of the kitchen. The drain hose connects either to a sink trap with a spare spigot or to a standpipe with its own trap, and the hose should rise high before dropping to stop waste water siphoning back into the machine. Leave enough slack in both hoses so the appliance can be pulled out for servicing. Check that nothing is kinked once the appliance is pushed into place, as this is a common cause of slow filling and poor drainage. Browse our plumbing valves to find a suitable valve for your appliance supply.
Do electric ovens and hobs need a dedicated circuit?
+
In most cases, yes. Larger electric ovens, range cookers and induction hobs draw a high current and are normally supplied by their own radial circuit from the consumer unit, controlled by a cooker switch. Some smaller single ovens can be connected to a fused connection unit instead, but this depends on the appliance rating and the manufacturer's instructions. In England, installing a new circuit in a kitchen is notifiable work under Part P of the Building Regulations, so it should be carried out by a registered electrician or signed off by building control. Share your appliance specifications with your electrician at the planning stage so the cable and circuit protection can be sized correctly. Our switches and sockets range helps you choose a finish to match your new kitchen.
What ventilation does a kitchen need?
+
Approved Document F of the Building Regulations requires kitchens in England to have extract ventilation that removes moisture and cooking fumes to the outside. For intermittent extraction, the minimum rate is 30 litres per second for a cooker hood above the hob, or 60 litres per second for an extractor fan positioned elsewhere in the room. A recirculating hood filters grease and odours but does not remove moisture, so it will not satisfy this requirement on its own. Ducted hoods perform best with the shortest possible duct run and as few bends as possible, using rigid ducting where you can. Replacement air also needs a route into the room, which is often provided by an undercut door or a trickle vent. Explore our extractor fans to meet ventilation requirements in your kitchen.
How should I seal around kitchen worktops and splashbacks?
+
Use a sanitary grade sealant with a mould inhibitor wherever the worktop meets the wall, along upstands and splashbacks, and around the sink and hob. Make sure the surfaces are clean, dry and free of dust or grease before you start, and apply masking tape either side of the joint for a neat finish. Run the sealant in one continuous bead, tool it smooth, then remove the tape before the sealant skins over. Allow the full curing time stated by the manufacturer before using the sink or wiping the area down. Most silicone sealants cannot be painted, so choose a colour that matches your worktop or splashback from the outset. Our kitchen and bathroom sealants are formulated for the wet, high use areas around a kitchen.
