Four free planning tools to help you get your quantities right before you buy. Calculate your patio area, edging pieces, MOT Type 1 sub-base tonnage, and 5:1 bedding mortar in minutes.
Work out your patio area, edging pieces, sub-base tonnage, and bedding mortar before visiting your nearest MP Moran branch.
1Patio size calculator
−
For L-shaped or irregular patios, break the space into rectangles. Multiply width by length for each section, then add them together to get your total area.
Calculate area
Reset
Area
m²
Tip: 7,800 mm = 7.8 m. For complex shapes, calculate each rectangle separately and add the totals together.
2Linear metre calculator
−
For edging and trims. Enter your total run length and individual piece length to find how many pieces you need, including a waste allowance.
%
Calculate pieces
Reset
Pieces required
pieces
Always round up to whole pieces when ordering. A 10% waste allowance is typical for straight runs; allow more for curves or patterns.
3Sub-base material calculator
−
Estimate how many tonnes of DTp1 / MOT Type 1 hardcore you need. Uses a bulk density of 2.12 t/m³.
m²
Calculate DTp1
Reset
Recommended DTp1
tonnes
Formula: area x (depth / 1000) x 2.12 t/m³. Recommended depth: 100 mm for patios, 150 mm+ for driveways.
4Bedding mortar (5:1) calculator
−
Estimates sharp sand and cement for a standard 50 mm mortar bed at a 5:1 mix ratio. Based on approx. 1,800 kg sharp sand and 319.2 kg cement per 20 m².
m²
Calculate mortar
Reset
Materials for 50 mm bed
Sharp sand
kg
Cement
kg
Sand bags (25 kg)
bags
Cement bags (25 kg)
bags
Per 20 m²: approx. 1,800 kg sharp sand and 319.2 kg cement. Ask your local MP Moran branch for product availability.